STATE OF NEVADA
Department of Business & Industry
Office of the Labor Commissioner
2000-01 PREVAILING WAGE RATES
LANDER COUNTY
APPLICABLE FOR PUBLIC WORKS PROJECTS AWARDED
OCTOBER 1, 2000 THROUGH SEPTEMBER 30, 2001
|
As Amendments/Addenda
are made to the wage rates, such will be posted to sites of the respective
counties. Please review regularly for any amendments posted or contact
our offices directly for further assistance with any amendments to the
rates.
|
|
CRAFT
|
RATE |
| |
|
| AIR BALANCE
TECHNICIAN |
|
| Air Balance Technician |
34.12 |
| |
|
| MECHANICAL INSULATOR
(formerly Asbestos Worker) |
- |
| Mechanical Insulator-Mechanic |
45.06 |
| Mechanical Insulator-Foreman |
46.56 |
| Mechanical Insulator-General Foreman |
47.56 |
| |
|
| BOILERMAKER |
- |
| Boilermaker-Journeyman |
20.85 |
| Boilermaker-Foreman |
23.93 |
| |
|
| BRICKLAYER |
- |
| Bricklayer |
17.00 |
| |
|
| CARPENTER |
ADD ZONE PAY |
| Carpenter-Journeyman |
30.10 |
| Carpenter-Foreman |
33.40 |
| |
|
| CEMENT MASON |
- |
| Cement Mason-Journeyman |
26.24 |
| Cement Mason-Foreman |
27.74 |
| |
|
| CONSTRUCTION
CLEAN-UP |
ADD
ZONE RATE (Eff. 11/16/00) |
| Construction Clean Up (picking
up debris, sweeping, scraping, and janitorial work, including final clean
up) |
23.67 |
| |
| ELECTRICIAN-ALARM
INSTALLER |
| Alarm Installer |
24.62 |
| |
| ELECTRICIAN-ELECTRONIC
COMMUNICATION TECHNICIAN |
| Communication Technician |
29.29 |
| |
|
| ELECTRICIAN-LINE |
- |
| Electrician Line-Groundman |
26.73 |
| Electrician Line-Lineman |
37.44 |
| Electrician Line-Foreman |
40.80 |
| Electrician Line-General Foreman |
43.65 |
| Electrician Line-Heavy Equipment Operator |
33.61 |
| |
|
| ELECTRICIAN-NEON SIGN |
- |
| Neon Sign |
29.15 |
| |
|
| ELECTRICIAN-WIREMAN |
- |
| Wireman |
30.67 |
| |
|
| ELEVATOR CONSTRUCTOR |
- |
| Elevator Constructor-Journeyman Mechanic |
42.61 |
| Elevator Constructor-Mechanic in Charge |
46.91 |
| |
|
| FENCE ERECTOR |
- |
| Fence Erector-Journeyman |
22.97 |
| Fence Erector-Foreman |
37.12 |
| |
|
| FLAGPERSON |
ADD
ZONE RATE (Eff. 11/16/00) |
| Flagperson |
20.80 |
| |
|
| FLOOR COVERER |
|
| Floor Coverer-Journeyman |
24.10 |
| Floor Coverer-Foreman |
26.10 |
| |
|
| GLAZIER |
- |
| Glazier |
22.50 |
| |
|
| HIGHWAY STRIPER |
ADD ZONE PAY |
| Highway Striper |
23.67 |
| |
| HOD CARRIER-BRICK
MASON TENDER |
| Brick Mason-Journeyman |
22.35 |
| Brick Mason-Foreman |
22.85 |
| |
| HOD CARRIER-PLASTERER
TENDER - ADD ZONE PAY |
| Plasterer Tender-Journeyman |
24.51 |
| Plasterer Tender-Foreman |
25.87 |
| |
|
| IRON WORKER |
- |
| Ironworker-Journeyman |
15.50 |
| |
LABORER - ADD
ZONE PAY
SEE GROUP CLASSIFICATIONS |
| |
|
| Landscaper |
18.51 |
| Furniture Mover |
20.01 |
| Group 1 |
23.67 |
| Group 1A |
20.80 |
| Group 2 |
23.77 |
| Group 3 |
23.92 |
| Group 4 |
24.17 |
| Group 5 |
24.47 |
| Group 6 |
- |
| Nozzlemen, Rodmen |
24.47 |
| Gunmen, Materialmen |
24.17 |
| Reboundmen |
23.82 |
| Gunite Foremen |
24.87 |
| |
| MILLWRIGHT -
ADD
ZONE PAY |
| Millwright - Journeyman |
36.62 |
| Millwright - Welder |
36.97 |
| Millwright Foreman |
38.99 |
| Millwright-Foreman Over Welders |
39.39 |
| |
OPERATING ENGINEER
- ADD ZONE PAY
SEE GROUP CLASSIFICATIONS |
| Group 1 |
30.78 |
| Group 1A |
33.54 |
| Group 2 |
34.07 |
| Group 3 |
34.34 |
| Group 4 |
35.08 |
| Group 5 |
35.38 |
| Group 6 |
35.55 |
| Group 7 |
35.80 |
| Group 8 |
36.39 |
| Group 9 |
36.71 |
| Group 10 |
37.06 |
| Group 10A |
37.25 |
| Group 11 |
37.49 |
| Group 11A |
39.13 |
| Group 11B |
39.94 |
| Foreman |
39.13 |
| Add 7% to base rate for "Second" Shift |
- |
| Add 12.5% to base rate for "Special" shift |
- |
| |
OPERATING ENGINEER-STEEL
FABRICATOR & ERECTOR
ADD ZONE PAY
SEE GROUP CLASSIFICATIONS |
| Group 1 |
46.08 |
| Group 1 Truck Crane Oiler |
40.81 (See
Addendum VIII) |
| Group 1 Oiler |
37.95 |
| Group 2 |
44.57 |
| Group 2 Truck Crane Oiler |
39.66 |
| Group 2 Oiler |
36.84 (See
Addendum VIII) |
| Group 3 |
43.33 |
| Group 3 Truck Crane Oiler |
39.44 |
| Group 3 Oiler |
37.52 |
| Group 3 Hydraulic |
39.11 |
| Group 4 |
41.60 |
| Group 5 |
40.50 |
| Add 7% to base rate for "Second" Shift |
- |
| Add 12.5% to base rate for "Special" Shift |
- |
| |
OPERATING ENGINEER
-PILEDRIVER- ADD ZONE PAY
SEE GROUP CLASSIFICATIONS |
| Group 1 |
45.53 |
| Group 1 Truck Crane Oiler |
39.59 |
| Group 1 Oiler |
37.67 |
| Group 2 |
44.01 |
| Group 2 Truck Crane Oiler |
39.37 |
| Group 2 Oiler |
37.47 |
| Group 3 |
42.56 |
| Group 3 Truck Crane Oiler |
39.16 |
| Group 3 Oiler |
37.24 |
| Group 4 |
41.05 |
| Group 5 |
39.94 |
| Group 6 |
38.83 |
| Group 7 |
37.87 |
| Group 8 |
36.91 |
| Add 7% to base for "Second" Shift |
- |
| Add 12.5% to base for "Special" Shift |
- |
| |
| |
| PAINTER |
| Brush/Roller Painter |
24.99 |
| Spray Painter |
23.64 ( See
Addendum I) |
| Sandblaster |
25.49 |
| Paperhanger |
25.74 |
| Structural Steel & Steeplejack |
25.99 |
| Swing Stage |
26.99 |
| Special Coating Application-Brush |
25.49 |
| Special Coating Application-Spray |
25.99 |
| Special Coating Application-Spray Steel |
26.24 |
| Foreman |
$1.00 above highest Journeyman |
| |
|
| PILEDRIVER (NON-EQUIPMENT) |
- |
| Journeyman |
39.19 |
| Foreman |
41.19 |
| |
| PLASTERER - ADD
ZONE PAY |
| Plasterer - Journeyman |
25.02 |
| Plasterer - Foreman |
26.02 |
| |
|
| PLUMBER/PIPEFITTER |
- |
| Plumber/Pipefitter |
35.35 |
| |
|
| REFRIGERATION |
- |
| Refrigeration |
29.18 |
| |
|
| ROOFER |
- |
| Roofer |
15.50 |
| |
|
| SHEET
METAL WORKER |
See
Addendum XI |
| Sheet Metal Journeyman |
32.87 |
| Sheet Metal Foreman |
34.12 |
| Sheet Metal General Foreman |
35.12 |
| |
|
| SPRINKLER
FITTER |
- |
| Sprinkler Fitter Journeyman |
36.45 |
| Sprinkler Fitter Foreman |
37.90 |
| |
|
| TAPER |
- |
| Taper |
26.24 |
| |
|
| TILE & TERRAZZO
WORKER |
- |
| Tile & Terrazo - Tile & Marble Finisher |
20.36 |
| Tile & Terrazo - Tile Setter |
27.48 |
| Tile & Terrazo - Marble Mason |
28.86 |
| |
|
| TRAFFIC
BARRIER ERECTOR |
- |
| Traffic Barrier Erector |
23.67 |
| |
| TRUCK DRIVER |
| Truck Driver |
27.75 |
| |
|
| WELL DRILLER (WATER WELL) |
- |
| Well Driller - Water Well |
9.00 |
| WELL DRILLER (TEST WELL)*Anything
not used for portable water production |
- |
| Test Well - Journeyman |
6.70 |
| Test Well - Foreman |
9.50 |
Rev. 11-10-00
ZONE RATES
UNLESS ZONE RATES HAVE CONTROLLING LANGUAGE
RATES ARE BASED ON DIRECT TRAVELED ROUTE.
CARPENTER (Highway
and Dam Construction only)
In addition to CARPENTER rates add the applicable
amounts per hour, calculated from the Washoe County Courthouse :
Zone 1-0 to 50 miles
0.00
Zone 2-50 to 150 miles
1.25
Zone 3-150 to 300 miles
1.75
Zone 4-300 miles and over 2.50
CARPENTER (Building Construction)
In addition to CARPENTER rates add the applicable amounts
per hour, calculated from the County Courthouse located in Reno:
Zone 1-0 to 35 miles
0.00
Zone 2-35 miles and over
2.50
HIGHWAY STRIPER (Highway
and Dam Construction only)
In addition to HIGHWAY STRIPER rates add the applicable
amounts per hour, calculated from [the Carson City Courthouse or]* the
Washoe County Courthouse :
Zone 1-0 to 50 miles
0.00
Zone 2-50 to 150 miles
1.50
Zone 3-150 to 300 miles
2.00
Zone 4-300 miles and over 3.00
*Amended 10/30/00; Effective 11/09/00
HIGHWAY STRIPER (Building Construction)
In addition to HIGHWAY STRIPER rates add the applicable
amounts per hour, calculated [from the County Courthouse
located in Reno:] as*
Zone 1-0 to 35 miles
0.00 (for all work performed within thirty-five road miles of a county
seat in Northern Nevada)*
Zone 2-35 miles and over 2.50
((where the starting point for the measurement of all distances described
shall be the respective County Courthouse)*
*Amended 10/30/00; Effective 11/09/00
HOD CARRIER (Plaster Tender)
In addition to HOD CARRIER-Plasterer Tender rates add
the applicable amounts per hour, calculated based on a radius from South
Virginia and Mill Street, Reno:
Zone 1-0 to 70 miles
0.00
Zone 2-70 miles and over 5.00
[For the purpose of this agreement, Fallon, Fallon Naval
Air Base, and the city of Yerington shall be a free zone.]*
*Amended 10/30/00; Effective 11/09/00
LABORER (Highway and
Dam Construction only)
In addition to LABORER rates add the applicable amounts
per hour, calculated from [the Carson City Courthouse or]* the Washoe County
Courthouse :
Zone 1-0 to 50 miles
0.00
Zone 2-50 to 150 miles
1.50
Zone 3-150 to 300 miles
2.00
Zone 4-300 miles and over 3.00
*Amended 10/30/00; Effective 11/09/00
LABORER (Building Construction)
In addition to LABORER rates add the applicable amounts
per hour, calculated [from the County Courthouse located in Reno]*
as:
Zone 1-0 to 35 miles
0.00 (for all work performed within thirty-five road miles of a county
seat in Northern Nevada)*
Zone 2-35 miles and over 2.50 (where the
starting point for the measurement of all distances described shall be
the respective County Courthouse)*
*Amended 10/30/00; Effective 11/09/00
MILLWRIGHT
In addition to MILLWRIGHT rates add the applicable
amounts per hour, calculated based on a radius from the County Courthouse
located in Reno:
Zone 1-0 to 15 miles
0.00
Zone 2-15 to 35 miles
1.50
Zone 3-35 miles and over 3.25
OPERATING ENGINEER
In addition to: OPERATING ENGINEER; Steel Fabricator
and Erector; and Piledriver rates add the applicable amounts per hour calculated
from Washoe county Courthouse:
Zone 1-0 to 50 miles
0.00
Zone 2-50 to 150 miles
1.50
Zone 3-150 to 300 miles
2.00
Zone 4-300 miles and over 3.00
PLASTERER
In addition to PLASTERER rates add the applicable amounts
per hour, calculated based on a radius from South Virginia and Mill Street,
Reno:
Zone 1-0 to 70 miles
0.00
Zone 2-70 miles and over 5.00
TRUCK DRIVER
In addition to Truck Driver rates add the applicable
amounts per hour, calculated from Washoe County Courthouse:
Zone 1-0 to 50 miles
0.00
Zone 1-50 to 150 miles
2.00
Zone 1-150 to 300 miles 2.50
Zone 1-Over 300 miles 3.50
TRAFFIC BARRIER ERECTOR
(Highway and Dam Construction only)
In addition to TRAFFIC BARRIER ERECTOR rates add the
applicable amounts per hour, calculated from the Carson City Courthouse
or the Washoe County Courthouse :
Zone 1-0 to 50 miles
0.00
Zone 2-50 to 150 miles
1.50
Zone 3-150 to 300 miles
2.00
Zone 4-300 miles and over 3.00
TRAFFIC BARRIER ERECTOR (Building Construction)
In addition to TRAFFIC BARRIER ERECTOR rates add the
applicable amounts per hour, calculated [from the County Courthouse
located in Reno]* as:
Zone 1-0 to 35 miles
0.00 (for all work performed within thirty-five road miles of a county
seat in Northern Nevada)*
Zone 2-35 miles and over 2.50 (where the
starting point for the measurement of all distances described shall be
the respective County Courthouse)*
*Amended 10/30/00; Effective 11/09/00
CLASSIFICATIONS
LABORER
Group 1
All cleanup work of debris, grounds, and building including
windows and tile
Dumpmen or Spotter (other than asphalt)
Handling and Servicing of Flares, Watchman
General Laborer
Limber, Brushloader and Piler
Traffic Control Supervisor
Group 2
Choker setter or Rigger (clearing work only) Pittsburgh
Chipper and similar type brush shredders
Concrete worker (wet or dry) all concrete work not listed
in Group3
Crusher or Grizzly Tender
Greasing Dowels
Guinea Chaser (Stakemen)
Panel Forms (wood or metal) handling, cleaning and stripping
of Loading and unloading, (Carrying and handling of all rods and material
for use in reinforcing concrete
Railroad Trackmen (maintenance, repair or builders)
Sloper
Semi-Skilled Wrecker (salvaging of building materials
other than those listed in Group 3)
Group 3
Asphalt Workers (Ironers, Shovelers, Cutting Machine)
Buggymobile
Chainsaw, Faller, Logloader and Bucker
Compactor (all types)
Concrete Mixer under 1/2 yard
Concrete Pan Work (Breadpan type), handling, cleaning\stripping
Concrete Saw, Chipping, Grinding, Sanding, Vibrator
Cribbing, Shoring, Lagging, Trench Jacking, Hand-Guided
Lagging Hammer
Curbing or Divider machine
Curb Setter (precast or cut)
Ditching Machine (hand-guided)
Drillers Helper, Chuck Tender
Form Raiser, Slip Forms
Grouting of Concrete Walls, Windows and Door Jams
Headerboardmen
Jackhammer, Pavement Breaker, Air Spade
Mastic Worker (wet or dry)
Pipewrapper, Kettlemen, Potmen, and men applying asphalt,
creosote and similar type materials
All Power Tools (air, gas, or electric), Post Driver
Riprap-Stonepaver and RockSlinger, including placing
of sack concrete wet or dry
Rototiller
Rigging and Signaling in connection with Laborers' work
Sandblaster, Potmen, Gunmen or Nozzlemen
Vibra-screed
Skilled Wrecker (removing and salvaging of sash, windows,doors,
plumbing and electrical fixtures)
Group 4
Burning and Welding in connection with Laborers' work
Joy Drill Model TWM-2A, GardnerDenver Model DN143 and
similar type drills (in accordance with Memorandum of Understanding between
Laboreres and Operating Engineers dated at Miami, Florida, Feb. 3, 1954)
and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical
Drillers on Multiple Units
High scalers
Concrete pump operator
Heavy Duty Vibrator with Stinger 5" diameter or over
Pipelayer, Caulker and Bander
Pipelayer-waterline, Sewerline, Gasoline, Conduit
Cleaning of Utility Lines
Slip Lining of Utility Lines (including operation of
Equipment)
TV Monitoring and Grouting of Utility Lines
Asphalt Rakers
Group 5
Foremen
Construction Specialists
Blasters and Powdermen, all work of loading, placing,
and blasting of all powder and explosives of any type, regardless of method
used for such loading and placing
Asbestos removal
Lead abatement
Hazardous waste
Material removal
Group 6
Gunite Foremen, Nozzlemen, Rodmen, Gunmen, Materialmen,
Reboundmen
OPERATING ENGINEER
Group 1
Engineer Assistant
Group 1A
Heavy Duty Repairman Helper
Oiler
Partsman (heavy duty repair shop partsroom when needed
Group 2
Compressor Operator
Material Loader and/or Conveyor Operator (handling building
materials)
Pump Operator
Group 3
Bobcat or similar loader, 1/4 cu. yd. or less
Concrete Curing Machines (streets, highways, airports,
canals)
Conveyor Belt Operator (tunnel)
Forklift (under 20 )
Engineer Generating Plant (500 K.W.)
Mixer Box Operator (concrete plant)
Motorman
Rodman/Chainman
Rotomist Operator
Oiler (truck crane)
Group 4
Concrete Mixer Operator, Skip type
Dinky Operator (Assistant to Engineer required)
Forklift (20' or over) or Lumber Stacker
Heavy Duty Repairman/Welder ( Deleted 10/25/00-See Group
8)
Ross Carrier
Skip Loader Operator (under one (1) cu. yd.)
Tie Spacer
Group 5
Concrete Mixers (over one (1) cu. yd.)
Concrete Pumps or Pumpcrete Guns
Elevator and Material Hoist ( one (1) drum)
Groundman for Asphalt Milling and similar
Group 6
Auger type drilling equipment up to and including 30
ft. depth digging capacity m.r.c. (any assistance required will be performed
by an Employee covered by this Agreement)
Boom Truck or Dual Purpose a-Frame Truck
B.L.H. Lima Road Pactor or similar
Chip Box Spreader (Flaherty type or similar)
Concrete Batch Plant (wet or dry)
Concrete Saws (highways, streets, airports, canals)
Locomotives (over thirty (30) tons)
Lubrication and Service Engineer (mobile and grease rack)
Maginnis International Full Slab Vibrator (airports,
highways, canals and warehouses)
Mechanical Finishers (concrete) (Clary, Johnson, Bidwell
Bridge Deck or similar types)
Mechanical Burn, Curb and/or Curb and Gutter Machine
(concrete or asphalt)
Pavement Breaker, Truck Mounted, with compressor combination
(Assistant to Engineer required)
Pavement Breaker or Tamper (with or without compressor
combination)
Power Jumbo Operator (setting slip-forms, etc., in tunnels)
Roller Operator (except asphalt)
Self-Propelled Tape Machine
Self-Propelled Compactor (single engine)
Self-Propelled Power Sweeper Operator
Slip-Form Pump (power-driven by hydraulic, electric,
air, gas, etc. lifting device for concrete forms)
Small Rubber-Tired Tractors
Snooper Crane, Paxton-Mitchell or similar
Stationary Pipe Wrapping, Cleaning and Bending Machine
Operator
Group 7
Auger type drilling equipment over 30 ft. depth digging
capacity m.r.c. (Assistant to Engineer or Mechanic/Welder required)
Compressor (over 2)
Concrete Conveyor or Concrete Pump, truck or equipment
mounted (any assistance required shall be performed by an Assistant to
Engineer) Boom length to apply
Concrete Conveyor, Building Site (any assistance shall
be an employee covered by this Agreement)
Drilling and Boring Machine, vertical and horizontal
(not to apply to waterliners, wagon drills or jack hammers) (Assistant
to Engineer or Mechanic/Welder required)
Crusher Plant Engineer
Generators
Instrument Man
Kolman Loader
Material Hoist (two (2) or more drums)
Mechanical Finishers or Spreader Machine (asphalt, Barber-Greene
or similar)
Mine or Shaft Hoist
Pipe Bending Machines (pipeline only)
Pipe Cleaning Machines (tractor-propelled and supported)
Pipe Wrapping Machines (tractor-propelled and supported)
Portable Crushing and Screening Plants (Assistant to
Engineer required)
Post Driller And/Or Driver
Pumps ( over 2)
Roller Operator (asphalt)
Screedman (except asphaltic or concrete paving)
Screedman (Barber-Greene and similar) (asphaltic or concrete
paving)
Self-Propelled Boom-Type Lifting Device (center mount)
(on ten (10) ton capacity or less)
Slusher Operator
Soil Tester (certified)
Soils and Materials Tester
Surface Heater and Planer Operator
Trenching Machine (maximum digging capacity three (3)
ft. depth) (Any assistance in the operation, if needed, shall be performed
by an Assistant to Engineer)
Truck-Type Loader
Welding Machines (gasoline or diesel)
Group 8
Asphalt Plant Engineer
Asphalt Milling Machine
Cast-In-Place Pipe-Laying Machine
Combination Slusher and Motor Operator
Concrete Batch Plant (multiple units)
Dozer Operator
Drill Doctor
Elevating Grader Operator
Gradesetter, Grade Checker
Grooving and Grinding Machine (highways)
Heavy Duty Repairman and/or Welder
Ken Seal Operator
Loader (up to and including two and one-half (2 1/2)
cu. yds)
Mechanical Trench Shield
Mixermobile
Push Cats
Road Oil Mixing Machine Operator Wood-Mixer (and other
similar Pugmill equipment)
Rubber-Tired Earthmoving Equipment (up to and including
thirty-five (35) cu. yds. "struck " m.r.c., Euclids, T-Pulls, DW10,
20, 21 and similar)
Self-Propelled Compactors with Dozer; Hyster 450, Cat
825 or similar
Sheepfoot
Small Tractor (with boom)
Soil Stabilizer (P & H or equal)
Timber Skidder (rubber-tired) or similar equipment
Tractor-Drawn Scraper
Tractor Operator
Tractor-Mounted Compressor Drill Combination (Assistant
to Engineer required)
Trenching Machine Operator (over three (3) feet depth)
(Assistant to Engineer required)
Tri-Batch Paver (Assistant to Engineer required)
Tunnel Badger or Tunnel Boring Machine Operator (Assistant
to Engineer required)
Tunnel Mole Boring Machine (Assistant to Engineer required)
Vermeer T-600b Rock Cutter
Group 9
Chicago Boom
Combination Backhoe and Loader (up to and including 3/8
cu. yd.) (Assistant to Engineer required when more than 200 hundred degrees
on swing)
Combination Mixer and Compressor (gunite)
Lull Hi-Lift (twenty (20) feet or over)
Mucking Machine (Assistant to Engineer required)
Sub-Grader (Gurries or other types) (Assistant to Engineer
required)
Tractor (with Boom) (D6 or larger)
Track-Laying-Type Earthmoving Machine (single engine
with tandem scrapers )
Group 10
Boom-Type Backfilling Machine (Assistant to Engineer
required)
Bridge Crane
Cary-Lift or similar
Chemical Grouting Machine (Assistant to Engineer required)
Derricks (two (2) Group 10 Operators required when swing
engine remote from hoist)
Derrick Barges (except excavation work) (Deck Engineer
and Assistant to Engineer required)
Euclid Loader and similar types (Assistant to Engineer
required when not controlled from the Pullcat)
Heavy Duty Rotary Drill Rigs (any assistance required
shall be performed by an Employee covered by this agreement)
Lift-Slab (Vagtborg and similar types)
Loader (over two and one-half (2 1/2 cu. yds. up to and
including four (4) cu. yds.)
Locomotive (over one hundred (100) tons, single or multiple
units)
Multiple-Engine Earthmoving Machines (Euclid Dozers,
etc.)
Pre-Stress Wire Wrapping Machine
Rubber-Tired Scraper, Self-Loading
Single-Engine Scraper (over thirty-five (35) cu. yds.)
Shuttle Car (Reclaim Station)
Train Loading Station
Trenching Machine (Assistant to Engineer required) multi-engine
with sloping attachments (Jefco or similar)
Vacuum Cooling Plant
Whirley Crane (up to and including twenty-five (25) tons)
(Assistant to Engineer required)
Group 10A
Backhoe-Hydraulic (up to and including one (1) cu. yd.)
(Assistant to Engineer required)
Backhoe (up to and including one (1) cu. yd.) (Cable)
(Assistant to Engineer required)
CMI Dual Lane Auto-Grader SP30 or similar type (Assistant
to Engineer required)
Cranes (not over twenty-five (25) tons) (hammerhead and
gantry) (Assistant to Engineer required)
Finish Blade
Gradalls (up to and including one (1) cu. yd.) (Assistant
to Engineer required)
Motor Patrol Operator
Power Shovels, Clamshells, Draglines, Cranes (up to and
including one (1) cu. yd.)
Rubber-Tired Scraper, Self-Loading (twin engine)
Self-Propelled Boom-Type Lifting Device, center mount
(over 10 tons up to and including 25 tons) (Assistant to Engineer required)
Group 11
Automatic Asphalt or Concrete Slip-Form Paver (Gradesetter,
Screedman and Assistant to Engineer required)
Automatic Railroad Car Dumper
Canal Trimmer (two (2) Assistants to Engineer required)
Cary Lift, Campbell or similar type
Cranes (over twenty-five (25) tons) (Assistant to Engineer
required)
Euclid Loader when controlled from the Pullcat
Highline Cableway Operator
Loader (over four (4) cu. yds. up to and including twelve
(12) cu. yds.)
Multi-Engine Earthmoving Equipment (up to and including
seventy-five (75) cu. yds. struck m.r.c.)
Multi-Engine Scrapers (when used to Push Pull)
Power Shovels, Clamshells, Draglines, Backhoes Gradalls
(over one (1) cu. yd. and up to and including seven (7) cu. yds. m.r.c.)
(Assistant to Engineer required) (two (2) Assistants to Engineer required
on 120B, similar or larger)
Self-Propelled Boom-Type Lifting Device (center mount)
(over 25 tons m.r.c.)
Self-Propelled Compactor (with multiple-propulsion power
units)
Single-Engine Rubber-Tired Earthmoving Machine, with
Tandem Scraper
Slip-Form Paver (concrete or asphalt) (one (1) Operator
and two (2) Screedman)
Tandem Cats and Scraper
Tower Crane Mobile (Assistant to Engineer required) (including
Rail Mount)
Truck Mounted Hydraulic Crane when remote control equipped
(over 10 tons up to and including 25 tons)
Universal Liebher and Tower Cranes (and similar types)
(in the erection, dismantling and moving of equipment there shall be an
additional Operating Engineer at Group 8 rates)
Wheel Excavator (up to and including seven hundred fifty
(750) cu. yds. per hour) (Assistant to Engineer required)
Whirley Cranes (over twenty-five (25) tons) (Assistant
to Engineer required)
Group 11A
Band Wagons (in conjunction with Wheel Excavators)
Operator of Helicopter )when used in construction work)
Loader (over twelve (12) cu. yds.)
Multi-Engine Earthmoving Equipment (over seventy-five
(75) cu. yds. "struck" m.r.c.)
Power Shovels. Clamshells, Draglines, Backhoes,
and Gradalls (over seven 7 cu. yds. m.r.c.) (Assistant to Engineer
required)
Remote-Controlled Earth Moving Equipment
Wheel Excavator (over seven hundred fifty (750) cu. yds.
per hour) (two (2) Group 11A Operators and one (1) Assistant to Engineer
required; any additional assistance shall be an Assistant to Engineer)
Group 11B
Holland Loader or similar or Loader (over 18 cu. yds.)
OPERATING ENGINEERS
- Steel Fabricator & Erector
Group 1
Cranes over 100 tons (Assistant to Engineer required)
Derrick over 100 tons
Self-Propelled Boom Type Lifting Devices over 100 tons
Group 2
Cranes over 45 tons up to and including 100 tons (Assistant
to Engineer required)
Derrick, 100 tons and under
Self Propelled Boom Type Lifting Device, over 45 tons
Tower Crane
Group 3
Cranes, 45 tons and under (Assistant to Engineer required)
Self Propelled Boom Type Lifting Device, 45 tons and
under
Group 4
Chicago Boom
Forklift, 10 tons and over
Heavy Duty Repairman/Welder
Group 5
Boom Cat
OPERATING ENGINEER
-Piledriver
Group 1
Derrick Barge Pedestal mounted over 100 tons (Assistant
to Engineer or Assistant Operator in lieu of Assistant to Engineer required)
Clamshells over 7 cu. yds.
Self Propelled Boom Type Lifting Device, over 100 tons
Truck Crane or Crawler, land or barge mounted over 100
tons (Assistant to Engineer or Assistant Operator in lieu of Assistant
to Engineer required)
Group 2
Derrick Barge Pedestal mounted 45 tons up to and including
100 tons (Assistant to Engineer or Assistant Operator in lieu of Assitant
to Engineer required)
Clamshells up to and including 7 cu. yds.
Self Propelled Boom Type Lifting Device over 45 tons
Truck Crane or Crawler, land or barge mounted, over 45
tons up to and including 100 tons (Assistant to Engineer or Assitant Operator
in lieu of Assistant to Engineer required)
Group 3
Derrick Barge Pedestal mounted under 45 tons (Assistant
to Engineer or Assistant Operator in lieu of Assistant to Engineer required)
Self Propelled Boom Type Lifting Device 45 tons and under
Skid/Scow Piledriver, any tonnage (Any assistance required
shall be by an Employee covered by this Agreement)
Truck Crane or Crawler, land or barge mounted 45 tons
and under (Assistant to Engineer or Assistant Operator in lieu of Assistant
to Engineer required)
Group 4
Assistant Operator in lieu of Assistant to Engineer
Forklift, 10 tons and over
Heavy Duty Repairman/Welder
Group 5
No current classification
Group 6
Deck Engineer
Group 7
No current classification
Group 8
Deckhand
Fireman
|